User Tools

Site Tools


rini:to-do_2011

This is an old revision of the document!


Bottom painting supplies

  • masks
  • gloves
  • scrapers
  • containers to mix epoxy paint (that won't melt, tin cans maybe)

Misc Info

  • Hatch dimensions: 89 x 66cm
  • Motor mount dimensions: 20 x 23cm, 3×1/2“ ply
  • Toe rail: 5.2m
  • Tiller: 57cm + rise of 10cm
  • Barber haul cleat wood bases: 7 x 3.5cm

To-Do

Long-term

  • Safety lines - or at least a bow pulpit
  • Lazy jacks?
  • Window replacement
  • Find replacement mast support pole? Need to deal with the top section of the pole, quite a bit of rust.

Engine/Systems

  • Install security bolts
  • Replace motor mount plywood
  • Depth sounder is dead- repair
  • motor mount, sliding up, could be lowered a bit?
  • replace starter battery with storage battery

Mast

  • Remove lost/dropped halyard blocks from center of mast
  • Either get 12-20 screws for spreaders or drill out to MM size
  • Replace masthead lamp with LED
  • Install baton to lift backstay over sail headboard when tacking?

Sails/Rigging

  • Shorten lower boom kicker length and re-attach (will allow more downward movement), need hacksaw and riveter at the boat
  • Forestay- rubs against jib halyard bearing, move it outside of the bearing position or remember to keep backstay loose
  • Re-install washers on jib halyard block
  • New sail cover

Hull

  • Patch small paint crack just above water line on starboard side near stern
  • Replace toe-rails
  • Replace hatch-cover
  • Install external hatch handle
  • Replace wood underneath spinnaker barber-haul cleats
  • Check rudder bearings and shaft condition
  • Bottom
  • Reattach (replace?) cockpit floorboards
  • Sand and varnish tiller

Cabin

  • Remove old log and fill holes
  • Glue metal plate back into place under stove hatch - don't think it will last, need screws instead (DIDN'T hold).
  • File pantry and stove cover doors down to allow for expansion
  • Re-attach trim to various panels
  • Floor board reinforce forward port side - completely rebuilding the forward floor boards, will take several gluing sessions and new screws.
  • Paint inside walls near cabin entrance
  • Sand and varnish walls underneath added deck supports (varnish is peeling)
  • Install hook under cabin hatch to allow easier spinnaker stowage (have brass hooks, but maybe something with a latch would be better)

Completed

rini/to-do_2011.1300180845.txt.gz · Last modified: 2011/03/15 05:20 by ben