User Tools

Site Tools


iw31:to-do

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Last revision Both sides next revision
iw31:to-do [2016/06/17 12:19]
ben [Spring 2016 (sale)]
iw31:to-do [2016/06/17 13:26]
ben
Line 3: Line 3:
  
   * <​del>​Finish re-wire</​del>​   * <​del>​Finish re-wire</​del>​
-    * finish runs, bundle all together +    * <del>finish runs, bundle all together</​del>​ 
-      * panel, auto-pilot, water pump, mast lamps, bundle for nav light switches +      * <del>panel, auto-pilot, water pump, mast lamps, bundle for nav light switches</​del>​ 
-      * screw down NMEA T's +      * <del>screw down NMEA T's</​del>​ 
-    * remove old fuse box+    * <del>remove old fuse box</​del>​
     * move house battery forward     * move house battery forward
     * cable runs to second house battery     * cable runs to second house battery
-    * remove old cabling+    * <del>remove old cabling</​del>​
   * New bracket for mast-head lamp   * New bracket for mast-head lamp
   * Cleanup & paint, new contact cement for some of the wallpaper   * Cleanup & paint, new contact cement for some of the wallpaper
   * Varnish bulkhead (fill screw holes with wood putty)   * Varnish bulkhead (fill screw holes with wood putty)
-  *  
  
 ===== Spring 2015 ===== ===== Spring 2015 =====
Line 20: Line 19:
   * <​del>​repair sail cover</​del>​   * <​del>​repair sail cover</​del>​
   * <​del>​new curtains, fix-up curtain rods</​del>​   * <​del>​new curtains, fix-up curtain rods</​del>​
-  * mast cabling connector install 
   * add switch for paralleling relay control?   * add switch for paralleling relay control?
-  * new battery charger? 
-  * Re-wire 220v interface 
   * Find good insulation and storage bins to re-do ice box   * Find good insulation and storage bins to re-do ice box
   * make styrofoam cutter with soldering iron & wire & coping saw?   * make styrofoam cutter with soldering iron & wire & coping saw?
-  * Find flexible conduit for wiring runs +  * <del>new diaphragm bilge pump install (done save clamps, two wood screws, and something to hold output hose from shaking)</​del>​
-  * new diaphragm bilge pump install (done save clamps, two wood screws, and something to hold output hose from shaking) +
-  * replace last big of bilge pump line, it's brittle+
   * <​del>​Move cooker gimbals forward in the box, outwards on the sides (thinner boards for mounts), and mount the cooker and pot holder</​del>​ Done!   * <​del>​Move cooker gimbals forward in the box, outwards on the sides (thinner boards for mounts), and mount the cooker and pot holder</​del>​ Done!
   * <​del>​Drill Ikea mixing bowls for pre-heating cups on cooker, cut them down by 1.5cm vertically to fit</​del>​   * <​del>​Drill Ikea mixing bowls for pre-heating cups on cooker, cut them down by 1.5cm vertically to fit</​del>​
-  * Fix-up the head: [[http://​www.groco.net/​svc-main.htm|http://​www.groco.net/​svc-main.htm]] 
   * Add mixing bowl below water separator/​fuel filter   * Add mixing bowl below water separator/​fuel filter
   ​   ​
iw31/to-do.txt · Last modified: 2016/06/22 08:27 by ben