This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Last revision Both sides next revision | ||
iw31:to-do [2016/04/28 05:32] ben |
iw31:to-do [2016/06/17 13:26] ben |
||
---|---|---|---|
Line 1: | Line 1: | ||
====== To-Do ====== | ====== To-Do ====== | ||
+ | ===== Spring 2016 (sale) ===== | ||
+ | |||
+ | * <del>Finish re-wire</del> | ||
+ | * <del>finish runs, bundle all together</del> | ||
+ | * <del>panel, auto-pilot, water pump, mast lamps, bundle for nav light switches</del> | ||
+ | * <del>screw down NMEA T's</del> | ||
+ | * <del>remove old fuse box</del> | ||
+ | * move house battery forward | ||
+ | * cable runs to second house battery | ||
+ | * <del>remove old cabling</del> | ||
+ | * New bracket for mast-head lamp | ||
+ | * Cleanup & paint, new contact cement for some of the wallpaper | ||
+ | * Varnish bulkhead (fill screw holes with wood putty) | ||
+ | |||
===== Spring 2015 ===== | ===== Spring 2015 ===== | ||
Line 5: | Line 19: | ||
* <del>repair sail cover</del> | * <del>repair sail cover</del> | ||
* <del>new curtains, fix-up curtain rods</del> | * <del>new curtains, fix-up curtain rods</del> | ||
- | * mast cabling connector install | ||
* add switch for paralleling relay control? | * add switch for paralleling relay control? | ||
- | * new battery charger? | ||
- | * Re-wire 220v interface | ||
* Find good insulation and storage bins to re-do ice box | * Find good insulation and storage bins to re-do ice box | ||
* make styrofoam cutter with soldering iron & wire & coping saw? | * make styrofoam cutter with soldering iron & wire & coping saw? | ||
- | * Find flexible conduit for wiring runs | + | * <del>new diaphragm bilge pump install (done save clamps, two wood screws, and something to hold output hose from shaking)</del> |
- | * new diaphragm bilge pump install (done save clamps, two wood screws, and something to hold output hose from shaking) | + | |
- | * replace last big of bilge pump line, it's brittle | + | |
* <del>Move cooker gimbals forward in the box, outwards on the sides (thinner boards for mounts), and mount the cooker and pot holder</del> Done! | * <del>Move cooker gimbals forward in the box, outwards on the sides (thinner boards for mounts), and mount the cooker and pot holder</del> Done! | ||
* <del>Drill Ikea mixing bowls for pre-heating cups on cooker, cut them down by 1.5cm vertically to fit</del> | * <del>Drill Ikea mixing bowls for pre-heating cups on cooker, cut them down by 1.5cm vertically to fit</del> | ||
- | * Fix-up the head: [[http://www.groco.net/svc-main.htm|http://www.groco.net/svc-main.htm]] | ||
* Add mixing bowl below water separator/fuel filter | * Add mixing bowl below water separator/fuel filter | ||
| | ||
Line 45: | Line 53: | ||
* VHF power (no run needed) | * VHF power (no run needed) | ||
* Panel power (should maybe install bus bars or [[http://www.toplicht.de/en/shop/bordelektrik-und-elektronik/steckverbindung/steckverbindungen-bordnetz/steckverbindungen-serie-692-und-694-philippi|water proof connectors]] in panel?) (4m) | * Panel power (should maybe install bus bars or [[http://www.toplicht.de/en/shop/bordelektrik-und-elektronik/steckverbindung/steckverbindungen-bordnetz/steckverbindungen-serie-692-und-694-philippi|water proof connectors]] in panel?) (4m) | ||
- | * Tiller pilot/auto pilot (4.5m) | + | * Tiller pilot/auto pilot (4.5m) - straight run back, skip the junction box in the engine compartment |
* Bilge pump (3.5m) | * Bilge pump (3.5m) | ||
* 12v Accessory ports (3m) | * 12v Accessory ports (3m) |